Case Study
Industrial Water Needs Restrained by Expensive Power
The Challenge Industrial Water Needs Restrained by Expensive Power LOCATION Istanbul, Turkey PROJECT Çolakoglu Metalurji A.S. CAPACITY 9,600 m /day ENERGY SAVINGS $US 800,000 or 6.2 million kWh/year* CO2 SAVINGS 3,627 tons/year** * Energy savings estimates based on Turkey’s power cost of $0.13/kWh * * Based on Energy Recovery’s proprietary Power Model analysis CASE STUDY 3 The quality and availability of freshwater supplies in Turkey are