Case Study

Industrial Water Needs Restrained by Expensive Power

Industrial Water Needs Restrained by Expensive Power

The Challenge Industrial Water Needs Restrained by Expensive Power LOCATION Istanbul, Turkey PROJECT Çolakoglu Metalurji A.S. CAPACITY 9,600 m /day ENERGY SAVINGS $US 800,000 or 6.2 million kWh/year* CO2 SAVINGS 3,627 tons/year** * Energy savings estimates based on Turkey’s power cost of $0.13/kWh * * Based on Energy Recovery’s proprietary Power Model analysis CASE STUDY 3 The quality and availability of freshwater supplies in Turkey are

Join for free to read