Case Study
Industrial Feeder Restoration
Industrial Feeder Restoration Case Study Challenge A major Midwest manufacturer of raw material used in making LCD chips needed to expand their manufacturing operation to accommodate a substantial increase in business. They already had two plants that were filled to capacity so they decided to build a new facility that would more than double the output of their existing operations. Besides the need for a new facility, the industrial customer had several critical power requirements. One requirement was for maximum service reliability because of the estimated millions of dollars of lost revenue if any significant downtime were to occur. The other requirement was an unusually short lead time to research, design, procure, test and commission the best power distribution system f