Case Study

Industrial Development – Newcastle

Industrial Development – Newcastle

Pages 1 Pages

FOCUS ON COMPLYING WITH WATER AUTHORITY FLOW RATE RESTRICTIONS To prevent surcharging, water authorities will often place flow rate restrictions on a site or require a costly upgrade to the main sewer that it connects to. Upgrading the infrastructure can be costly or impractical, so complying with the flow rate restrictions is often preferred. This can be achieved through careful analysis of the site and correct specification of th

Join for free to read