Case Study

Increased safety, reduced costs with Micro Motion Coriolis meters

Increased safety, reduced costs with Micro Motion Coriolis meters

Pages 2 Pages

Increased safety, reduced costs with Micro Motion Coriolis meters CHEMICAL RESULTS • 14% product giveaway eliminated while customer specification met, two-month payback • Increased system cleanliness improving revenue by $250,000 per batch • Increased worker safety due to the elimination of manual sampling • One fewer worker required to operate process APPLICATION A world-leading chemical film/coating manufacturer operates a batch process by manually adding ingredients via a bucket. This process requires workers to do manual labor, which can be challenging and unsafe. This process is also extremely slow and can lead to inaccurate measurements. CHALLENGE In this bucket-filling process, all filling was done on the ground causing workers to constantly bend over to fill

Join for free to read