Case Study

In Control

In Control

Pages 3 Pages

W ith lean operations quickly becoming the standard over traditional production methods, time becomes all the more critical. Faster is most certainly proving to be better. For today’s powder coating operations that are spraying more colors than ever that often means fast color changes are a must. Those color changes could take as little as 20 seconds with spray-to-waste systems or as fast as 10 minutes with reclaim systems. At the heart of these

Join for free to read