Case Study
Improved efficiency levels at The Church, Ettiley Heath with Smith’s
Case Study The Church, Ettiley Heath, Elworth Improved efficiency levels at The Church, Ettiley Heath with Smith’s. The Client The Church, Ettiley Heath required new heat emitters for its hall, church and lavatories. Originally built in 1888 as a Primitive Methodist church, its community hall was built in 1954. In 2003, the Methodist church joined with the local Anglican Church St. Peter’s, Elworth, to serve the ever growing mixed age community. The Challenge The church hall had high ceilings, making the space difficult to heat satisfactorily with panel radiators. The church also required a new heating solution and the lavatories required new heating as well. The £130,000 renovation project also included a new toilet block, including disabled facilities, new kitchen, and g