Case Study

Illico’s Convenience Store

Illico’s Convenience Store

IFS Retail Case Study: Illico Iincorporated Printed on paper containing 30% Post Consumer Waste.. @2010 Innovative Facilities Systems PROJECT OVERVIEW Illico’s convenience store operation was experiencing rising electricity bills for their eight retail convenience stores and 26,000 sq. ft. office building, primarily due to their old high wattage metal halide canopy lights and old T12 fixtures throughout their system. IFS recommended a switch to their compact florescent retrofit kits for their 320 watt metal halide canopy fixtures and T8 conversion kits for their T12 fixtures. The results were better light levels and a significant reduction in energy costs! The projected annual savings and environmental impacts reflected below are for 8 stor

Join for free to read