Case Study

IFA National Football Stadium

IFA National Football Stadium

Pages 1 Pages

Case Study IFA National Football Stadium Product: Allan Block Modular Block Location: Windsor Park, Belfast Client: O’Hare & McGovern Consultant Engineer: Arup Architect: Hamilton Architects Dimensions: 120m long by 2.0m high Description of Works Retain Solutions Ltd were appointed to design, supply and erect dry stack a modular block wall as part of the £35m redevelopment of Windsor Park, Belfast. The wall was constructed to accommodate t

Join for free to read