Case Study

Hydrotech

Hydrotech

Pages 2 Pages

“We started with du for reason of cost,” states Hammad Hussan Syed, Hydrotech’s Manager of Finance and Operations. “We believed du would be cheaper, which we have found to be true. We are making savings of around AED30,000 a year by moving to du.” A ?rst move was to switch over to du the company’s 16 landline connections that were in place at Hydrotech o ?ces in Dubai, Sharjah and Abu Dhabi. Hydrotech Case study Hydrotech ?nds pool of

Join for free to read