Case Study
Hydronic Systems
Hydronic Systems Case Study LibraryLocation: Ogden, Utah Project Cost: $48,823,000 Square Footage: 8,000 ft 2 Architect: EDA Architects Inc. Mechanical Engineer: Colvin Engineering Associates, Inc. Price Representative: Midgley-Huber, Inc. The Challenge: Built in 1936, Ogden High School relied on noisy unit ventilators for cooling. The project mandated that the art deco façade of the building be maintained, meaning that the renovations requi