Case Study

HVAC Retrofit Project Saves $228K

HVAC Retrofit Project Saves $228K

Pages 1 Pages

HVAC Retrofit Project Saves $228K The Resort at Squaw Creek, a 405- room conference facility here, lowered annual electricity consumption by over four million kilowatt hours (kwh) as a result of a new control system & other HVAC retrofits. The direct digital control system and the HVAC measures were installed in two phases at a total cost of $500,000, according to Larry Bullock, Squaw Creek’s chief engineer and director of property operations. T

Join for free to read