Case Study

Husky Tucker Lake Project -- an Aquatech SAGD Installation

Husky Tucker Lake Project -- an Aquatech SAGD Installation

Project Overview Construction on the Tucker Thermal Oil Sands Project began in the fall of 2004. The Tucker Project, which is estimated to have a 35 year project life and peak produc- tion of more than 30,000 barrels per day, is anticipated to be commissioned and producing oil by the end of 2006. Husky will use steam assisted gravity drainage (SAGD) technology to recover bitumen at Tucker. A key advan- tage of the Tucker thermal project is i

Join for free to read