Case Study
Hulcher Services Demolishes Three Signals Structures For PTC Project
Scope The railroad installed new signals along a two-mile stretch of track. The new signals will serve the same function as the existing ones for the time being, but ultimately will support Positive Train Control (PTC) when that program goes online. Before the railroad could activate the new signals, they needed to have an existing ? ve-track signal bridge, cantilever and tower removed and the new signals rotated into place over the tracks.