Case Study
hrl: Improves Saftey And Reduces Water Consumption At Muja Power Station
Muja Power Station - The existing wet handling systems at Muja were requiring constant maintenance, repair, and using significant quantities of water to quench hot ash from the boiler. Safety of the operation was also a concern, as hot ash can be explosive when it comes in contact with cold water. - Synergy engaged hrl: to design, onstruct, import, install and commission three Dry Bottom Ash Handling Systems (DBAHS) on Units 5, 7, and 8. These DBAHS (researched, designed, and developed in conjunction with a Chinese supplier), crush, remove, and air cool hot ash without the need to water quench resulting in a dry product that can be transported via truck, and potentially used in road base.