Case Study
Houghton Highway Bridge duplication project
Project Profile Project Description In 2008, Hanson was contracted as the major supplier for the $315 million Houghton Highway Bridge duplication project. The project involved the construction of a 2.7 km bridge, featuring three traffic lanes, a pedestrian/cycle path and a dedicated fishing platform, between Brisbane and Redcliffe. The bridge was to be situated 35 m east of the existing Houghton Highway Bridge. Hanson supplied 35,000 cubic me