Case Study
Hotel Hershey Conference Center
Hotel Hershey Conference Center Hershey, PA The Challenge This building was constructed for use as a temporary confer- ence room during a major renovation at the Historic, Hotel Her- shey. It was important that this building blend in with the ethics of the surrounding buildings and immaculate gardens. The hotel did not want this temporary building to look out of place like traditional temporary buildings. The facility hosts count- less weddings and special events and near perfection was a requirement. A light tan stucco exterior was installed which complimented the nearby light colored brick building. A barrel, steel, mansard roof line was installed which had four accenting columns resting on pedestals also to match surroundings. The building was installed 20’ off of the hotel so t