Hot Cutover of New Instrument Loops Saves Time, Leads to Broader Application of AMS Suite

Hot Cutover of New Instrument Loops Saves Time, Leads to Broader Application of AMS Suite

Pages 2 Pages

“Emerson’s proven ‘one-loop- at-a-time’ concept makes online ‘hot’ cutovers more desirable than shutting down an entire unit for commissioning.” Staff Instrument Engineer REFINING For more information: www.assetweb.com Hot Cutover of New Instrument Loops Saves Time, Leads to Broader Application of AMS Suite RESULTS • 50% reduction in commissioning time through hot cutover technique • Lower commissioning costs • Continued revenue generation by maintaining production • Established infrastructure for refinery-wide online monitoring and asset management APPLICATION Some 120 Fisher ® digital valve controllers and 200 HART ® field devices were commissioned and their control loops verified as part of a distributed control upgrade of a hydrofluoric acid (HFA) unit at a 300,000 b