Case Study
Hospital in Salford
Hospital redevelopment Hospital in Salford Concrete for piling Hanson EasyPile® CFA has been successfully utilised in the redevelopment of a hospital in Salford. The development included the design of a new link building incorporating continuous flight auger (CFA) cast piles for the foundations. This method was chosen as it causes minimal disturbance and thus reduces the risk of any damage to the adjacent buildings. Challenges A major problem for