Case Study
Honeywell's Integrated Control and Safety Systems for Wison FLNG
Honeywell ’s Integrated Control and Safety Systems for Wison FLNG Case Study Using Honeywell technology, the most complex automation system in FSRU was completed one month ahead of schedule, and the project cost was reduced by 2%, providing a good foundation for ensuring the completion of the entire project on schedule. A good return on investment greatly increases customer satisfaction. Background A Floating LNG storage and Regasification unit (FSRU) is an unpowered propulsion barge with 600 million standard cubic feet per day (MMscf/d) capacity regasification plant. It also has a 25,000 cubic meter self-supporting storage tank and a residential block. As the general contractor of the FSRU project, Wison Offshore & Marine faced a major