Case Study
Home Depot
Jumbo fixture sets HOME DEPOT CASE STUDY ™TRIAD helped develop an expanded, upscale appliance department for Home Depot to accommodate the significant line expansion, Jumbo. TRIAD was asked to design, engineer and prototype the new fixture within 4 weeks. Metal framework fixtures were produced and powder coated at TRIAD’s St. Louis location and also overseas, then finished with laminated MDF. After prototyping, TRIAD was asked to produce and