Case Study
Hoa Nghiem Community & Cultural Centre
BRITEX PROJECT ROLE Britex was engaged by the building contractor to manufacture and install specially fabricated stainless steel fixtures for the project. This process included generating shop drawings, consultation in fixture design, manufacturing each fixture, project managing and coordinating the production of fixtures with the primary contractor and installing the fixtures on site. Stainless steel works and fixtures for the project included: • Specially designed custom ‘F’ shape wet bench incorporating two sets of integral double bowl sinks, complete with upstand, shelf under, support legs and Britex high impact nylon adjust- able feet. Supplied in one piece. • Stainless steel Prep Table Benches in various custom sizes with Britex high impact nylon adjustable feet. • Stai