Case Study

HMP Shotts

HMP Shotts

Pages 1 Pages

More Information Project Overview Gallery Services Project Details Client Location Principal Contractor Engineer / Consultant / PQS Public Case Studies Sector Project All works were conducted next to the existing prison which remained operational throughout. Careys was awarded a contract for bulk earthworks and lime stabilisation on the site of the new prison. Deep drainage of 6-7m depth was installed along with infrastructure w

Join for free to read