Case Study

HKIVE Lee Wai Lee Campus: Cementaid Caltite System for the auditorium base slab

HKIVE Lee Wai Lee Campus: Cementaid Caltite System for the auditorium base slab

Pages 2 Pages

Project Page: HKIVE Lee Wai Lee Campus HKIVE Lee Wai Lee Campus An instituitite of Education project designed and used Cementaid Caltite System at the auditorium base slab for its maintenance free, time saving and reliable waterproofing performance. Completion Date: Sep 16, 2008 Architect: P & T Architects and Engineers Ltd. Contractor: Penta Ocean - CRCC Joint Venture 1 / 2 Structural engineer: Ove Arup & Partners Hong Kong Limited Products Used: Everdure Caltite Address: 3 King Ling Road Tseung Kwan O, New Territories, , Hong Kong, Type: Educational Powered by TCPDF (www.tcpdf.org) 2 / 2

Join for free to read