Case Study
Hinckley
Product Solid Edge Business challenges Machinery, tanks and other equipment must be creatively arranged below the deck to make the best use of space Conveying information to subcontractors by means of drawings was limited and sometimes resulted in miscommunication With no easy way to check fit in 2D, Hinckley erred on the side of caution but lost space as a result Keys to success Replace 2D CAD with 3D to create assembly models repr