Case Study
Hilton Hotel, Southwark: Construction of a major new hotel on London’s South Bank has required the excavation of a large two-level basement in poor gr
Hilton Hotel, Southwark: Construction of a major new hotel on London’s South Bank has required the excavation of a large two-level basement in poor gr
34m Span Hydraulic Props Introduction Key Points Integrated Load Monitoring Bespoke Fabricated Solutions Construction of a major new hotel on London’s South Bank has required the excavation of a large two-level basement in poor ground conditions in an extremely built up location. The main contractor is GTM, a joint venture between McGee and Galliford Try, which has taken the unusual step of eliminating the use of subcontractors wherever