Case Study
High Hazard Tablet Facility
Greenside Way, Middleton, Manchester M24 1SW T: +44 (0)161 655 3344 F: +44 (0)161 655 3399 W: www.besltd.org Exceeding Expectations Boulting Environmental Services Ltd Part of the Boulting Group Ltd High Hazard Tablet Facility encompassing Granulation, Milling, Fluid Bed Drying and Compression Suites. The challenge of carrying out substantial construction works without disrupting critical site operations was one of the key success factor