Case Study

Herning Power Plant, DK

Herning Power Plant, DK

Pages 2 Pages

H ER N I NG POWER PL ANT, DK Case stories - BWE BoilersBurmeister & Wain Scandinavian Contractor A/S Gydevang 35 ? DK-3450 Allerød ? Denmark Phone: +45 4814 0022 ? bwsc@bwsc.dk ? bwsc.com BWSC-30-0015-rev11-04/18 Vibration grate at test assembly in workshop. Fuel 1982 2000 2002 2009 Coal HFO Natural gas HFO Natural gas HFO Wood chips Natural gas HFO Wood chips Wood pellets Steam data bar 115 115 115 115 °C 525 525 525 525 kg/s 118 118 118 118 Max load % 100 100 100 100 - with bio* % 45 ~90 Min load % 30 30 30 30 NOx (boiler exit) mg/m 3 N** 650 450 150 450 225 450 350 (N-gas) (HFO) (Bio) 225 450 350 (N-gas) (HFO) (Bio) * Contribution of max load **Vol%O 2-dry for N-gas - 6 Vol%O 2-dry for other fuels In 1982, BWSC (then: BWE) designed and supplied the boiler for Herning Power P