Case Study

Helical Pulldown Micropiles: Railroad Over A Watermain

Helical Pulldown Micropiles: Railroad Over A Watermain

Pages 1 Pages

Geotechnical Consultant: Soil Mat Engineers and Consultants Hamilton, ON Contractor: EBS Engineering Construction Breslau, ON ® ® POWER SYSTEMS, INC. NOTE: Because Hubbell has a policy of continuous product improvement, we reserve the right to change design and specifications without notice. A CASE HISTORY Project: Railroad over a Watermain, Toronto, ON The Problem: A Canadian Pacific Railway track was to be rerouted, crossing a shallow 48-in. di

Join for free to read