Case Study

HEATING SYSTEM: Potterton Suprima24KW Non Condensing Boiler installed in 1991

HEATING SYSTEM: Potterton Suprima24KW Non Condensing Boiler installed in 1991

Lister Housing Cooperative Case study CUSTOMER: Lister Housing Cooperative LOCATION: Lauriston Place, Edinburgh HEATING SYSTEM: Potterton Suprima 24KW Non Condensing Boiler installed in 1991. Lister Housing Association carried out a trial on Vortex. The property is a 6 bed 3 storey Georgian terrace with high ceilings and hard to heat. The existing boiler was an old non condensing boiler and before fitting of Vortex the gas bills were excessive and 2 of the radiators were not heating. After the installation of Vortex and re-commissioning, within 20 minutes the boiler setting was reduced by 20%. Since then the setting has been reduced further and the non performing radiators are now heating at the same temperature as the rest.