Case Study

Heathrow Terminal 5

Heathrow Terminal 5

Four Square Metal Ltd Unit 13 , 193 Garth Road Morden SM4 4LZ foursquaremetal.co.uk T. 020 8335 4000 F. 020 8335 0900 Cert Ref 3787 ISO 9001 20943 The Terminal 5 building is on a 260-hectare (640-acre) site, with two satellite buildings linking to the main terminal by an underground. The four storey terminal became fully operational in June 2011, and included a group of satellite buildings, a new control tower and a railway station. Working with Heathrow’s appointed contractors, Four Square Metal was chosen to fabricate a range of barriers, headwall unit with OPO mirror and signals. The work, won on competency and budget, was for multiple units that were fabricated from mild steel and 316 grade stainless steel. All mild steel products were electroplated and powder coated to provi

Join for free to read