Case Study
Head Drum
Case Study INDUSTRY APPLICATION PROBLEM SOLUTION Head Drum BENEFIT A Sand Quarry in South Australia was experiencing continuous change-outs of the bearing housings as well as the head drum itself as water and sand splashed back from the trammel. The bearings would need to be changed every 6 – 8 weeks and the head drum would need