Case Study
Harvard Utility Infrastructure North Campus
Harvard University’s North Campus Expansion project includes six phases of construction and renovation for 14 new buildings totaling 1.2 million square feet. The project’s utility master plan provided a detailed design guide for upgrading the campus infrastructure and for installing generation and distribution systems to service the new buildings. INTRICATE SITE CONSTRAINTS The infrastructure project weaves through the historic campus, confro