Case Study
Harbor Freight Tools, USA
1201 Main Street • Suite 2360 Columbia, SC 29201 803.779.3025 redrockdevelopments.com Specs Case Study A greenfield site selected by Harbor Freight Tools, USA proved challenging because of its: • high water table, • lack of improved roads to the site, and • lack of utilities at the site. After obtaining all easements, arranging financing and supervising development of design, the schedule dictated starting construction at a less than desirable time of the year— winter. Weather challenges usually delay construction, however an experienced development team can anticipate potential challenges and mitigate their impact on a project schedule. Working with the local Development Board to secure water, sewer and road grant monies for an entire 500-acre industrial park, made Harbor Freight