Case Study
Happy Valley Race Course
CASE STUDY www.fosroc.com The Drainage Services Department (DSD) has long planned to solve the drainage problem at Happy Valley region on Hong Kong Island. The Happy Valley area is geographically a natural basin with a very large catchment area, each summer the rain water collected by the drains was not discharged quickly enough after heavy rainstorms causing back flow. Therefore, this has always been a top priority on DSD’s a