Hanseatic Power Solutions GmbH: Electrical engineering - digital is faster
Hanseatic Power Solutions GmbH: Electrical engineering - digital is faster Hanseatic Power Solutions (HPS) reckon on just 6–8 weeks to design and construct highly complex switchgears – and they’re often even faster. This is possible only by electrical design being as consistent as possible and highly automated. In addition to EPLAN Electric P8 and EPLAN Pro Panel, HPS are also using the “Copper” module and, just recently, the new EPLAN Cogineer. Jeddah, Mecca, Benin City. These are some of the locations where personnel from Hanseatic Power Solutions GmbH (HPS) have recently installed switchgear systems. Many systems are also travelling the high seas, i.e. on ships. There are also large HPS systems in locations neighbouring the company base in Norderstedt, Germany – e.g. at the University M