Case Study

Hangar 6 Expansion, NAS Whidbey Island

Hangar 6 Expansion, NAS Whidbey Island

Pages 2 Pages

POWERFUL DRAWING CONTROL After construction on the hangar began, Nathan Howat, the Vice President of Blue Mountain Electric, sought a solution that would keep up-to-date drawings in his crew’s hands. Previous tools that Howat had tested to resolve this issue did not adequately suit Blue Mountain’s needs and fueled his search for a better alternative. That search ended when he discovered Fieldwire, a construction management app that allowed the Blue Mountain team to retain all of their detailed on-site markups even after updating the sheet versions. The ability to deliver current drawings to his employees without losing valuable data certainly struck a chord with Howat. The next hurdle that Howat’s team encountered on the Whidbey Island project was speed, specifically the increasi

Join for free to read