Case Study
Hagley Cricket Oval Temporary Stadium - New Zealand
CirtexIndustriessuppliedPlatipusS8anchoringsystemswhichweredeliveredfromtheUK,andinstalledwithin10 days.CirtexworkedcloselywithCityCareLtdsupplyinginstallationtoolsandprovidingaprojectmanagertogive technical advice throughout. Each anchoring system was proof tested to 40 kN and connected to the stadium structurewithtensionedstrops.UnderintensetimepressurePlatipusandCirtexprovidedaswift,safeandeasyto installsolution. The Hagley Cricket Stadium in Christchurch was chosen to host a number of matches in the 2015 Cricket World Cup and so required extensive additional seating capacity. Temporary stands were erected at short notice just beforetheopeningfixturewhichrequiredanchoring. Solution Hagley Cricket Oval Temporary Stadium - New Zealand CASE STUDY Project Specification 191017 PDEA , ARGS an