Case Study

Hackbridge

Hackbridge

Pages 1 Pages

www.coinford.co.uk GROUNDWORK AND CONCRETE FRAME SPECIALISTS Hackbridge CLIENT: Barratt Homes Kent CONTRACT VALUE: £20 Million HACKBRIDGE, LONDON, SM6 7EL CASE STUDY Phase 1a of the redevelopment of the Felnex Trading Estate, this phase consists of 39 no traditional housing plots and 4 no blocks of flats, two of which are constructed of reinforced concrete podiums. Works commenced Sept 2016 SCOPE OF WORKS Pile mats Pile attendance Attendance on the installation of district heating Installation of main drainage Construction of roads, footpaths and hard standing Foundations, substructure blockwork and precast concrete floors Domestic drainage and services. Construction of 2 no reinforced concrete podiums Installation of storm water attenuation system Section 278 works to t

Join for free to read