Case Study

Gypsum Slurry

Gypsum Slurry

Pages 1 Pages

• Application Info – Pumps : Warman – Model : 4/3 – Application: Water Reticulation from Coal Mine – Shaft Speed: 1450 RPM – Product: Gypsum Slurry – Solids : 30 - 40% – Temp: Ambient • Problem – The expected packing life was 2-3 months with a flush rate of 680 LPH. – Flush water, shaft sleeve, bearings, packing, and labour costs totaled up to $11,570 annually per pump • Solution – SpiralTra

Join for free to read