Case Study

Gymnasium Running Track Removal

Gymnasium Running Track Removal

CASE STUDY: MERCURY CONTAINING POLYURETHANE FLOORING Project Description: GYMNASIUM RUNNING TRACK REMOVAL Scope of Services: AET was contracted to perform airborne sampling for mercury during the removal/replacement of a polyurethane running track located in a gymnasium of a major university. Bulk sample analysis of the polyurethane flooring confirmed mercury content. The removal contractor was responsible for developing the scope of wor

Join for free to read