Case Study

Gulf Mariner Condominium Cathodic Protection

Gulf Mariner Condominium Cathodic Protection

Pages 2 Pages

Gulf Mariner Condominium Cathodic Protection This building is the first condominium on the west coast of Florida to receive Corrpro’s impressed current cathodic protection (CP) system for controlling corrosion of the reinforcing steel in the concrete walkways and balconies. The project was completed in two phases as part of two separate restoration contracts. Gulf Mariner is a five story concrete and masonry structure with 79 residential units

Join for free to read