GRP Covered Walkway

GRP Covered Walkway

Pages 1 Pages

Specialists in the manufacture of GRP Architectural Industrial Modular Buildings Ship Fit Out Water Treatment GRP Covered Walkway: Having previously worked with both the Client and Architect, Millfield were approached to look at a connection between a new building and an existing facility. The Client could have gone down the traditional build route which would have taken several months. Instead, it was decided to prefabricate three separate units off site which could be delivered to the facility and then be bolted together. All three units were fully fitted out, including curtain wall glazing elements, electrical and air conditioning, at our assembly unit in Newcastle upon Tyne. Complete design and build package from structural steelwork to installation was produced on this contract by Mil