Ground Source Review: Charlestown School, Cornwall October 7, 2014 The main driving force behind the decision to install a heat pump at this school was the need to reduce costs of the heating and air conditioning system. Charlestown’s school was built in the 1960’s and is next to a railway line. As a result of the associated noise and pollution, the windows in the building had to remain permanently closed and the air-conditioning had to operate all year round leading to high running costs. The solution was to install an 80 kW ground source heating system which could provide cooling in the summer and heating in the winter. The heating/cooling is distributed into the school via an air ducted system. The ground source heat pumps installed are connected to 10 boreholes which are placed within