Case Study

Ground Flare Radiation Fence

Ground Flare Radiation Fence

Pages 1 Pages

Executive Summary Partnering with the owner and its EPCM, TorcSill designed, manufactured and installed more than 23,000 linear feet of helical piling material in less than one month to support a radiation fence for the time-sensitive Ground Flare Project. Challenges At time of initial design, it was known that this location was the site of an old construction landfill, presenting sub­ grade debris challenges such as concrete and rebar, as well as organic materials within the top 20 feet of com­ pacted fill. Later, it was learned that the pad contractor had used a stabilization technique that had cemented the soils. Adding to the pre-existing subgrade challenges, down drag on the piles, high lateral loads and a very aggressive construction schedule dictated a sound engineering and