Case Study
Greyhound Bus Terminal Los Angeles, CA
To reduce the impact on staff parking, the specialist contractor was used throughout divided the project into two sections. The existing membrane system was first removed using spe- cialized milling equipment and the concrete deck was then shot- blasted using vacuum blastcleaning. After careful inspection, all non-structural cracks greater than 1/16” were cut out and filled using Sikaflex 2C, a two component polyurethane joint sealant. All defe