Case Study
Grenade Wind Park Rodrigues Island - Mauritus
Description: Grenade Wind Farm is composed of 4 GEV MP of 275kW. It is the third Vergnet wind farm achieved by Vergnet and CEB in Rodrigues after Trefles site, commissioned in 2002 with 3 wind turbines type 15/60 and Grenade I, 2 turbines in 2009 which has been extended with 2 more turbines on the same site of Grenade in 2010. The national electric company called CEB is willing to develop the wind power on the islands of Mauritius an