Case Study

Greenwich Substation

Greenwich Substation

Pages 1 Pages

CASE STUDY 01403 799600 info@cordek.com Please contact us for more information Greenwich Substation Case Study 05/17 Project Scope Sheet piles were used to support the excavations during construction of the basement. The basement construction consists of a 300mm thick reinforced concrete wall which is cast against the sheet pile wall. Cordek were approached to supply a product to infill the pans of the sheet piles to create a flat surface to cast the wall against. The Solution Sheet pile infills are designed as a quick and lightweight solution to infilling the open pans in the exposed sheet pile wall. Manufactured from Filcor EPS (Expanded Polystyrene), they are profiled to the exact dimensions of the trough shaped voids. The infills come in lengths of 1.2m, making them easy to h