Case Study

Greenwich Middle School

Greenwich Middle School

Pages 1 Pages

GEI designed an innovative subsurface drainage system that was installed beneath the existing building in a 5 foot high tunnel using hand and power tools at the Greenwich Middle School in Greenwich, CT. Often in the spring and after storms, the plenum floor would be covered with water up to a few inches deep. The plenum is part of the HVAC system for circulating and exchanging air in the school. The 5 foot high plenum included wate

Join for free to read