Case Study

Green Piping Alternative Fits Hotel Installation to a Tee

Green Piping Alternative Fits Hotel Installation to a Tee

Pages 1 Pages

“The installation lasted approximately two weeks. If this had been a steel pipe installation it would have been three to four weeks to cut and thread pipe this size and then deal with weight issues.” - Jay Faraci, Owner of Metal Masters Mechanical LLC • The limited installation space was a non-issue thanks to the superior flow rate of Aquatherm’s polypropylene (PP- R) pipe • Cimatherm weighs up to 75% less than comparably sized metal pipe

Join for free to read