Case Study
Grass Protection
The installation took place in May 2008 and was in full operation by September. GRASSPROTECTA was specified in order to offer an economical surface capable of withstanding regular vehicle loads, whilst preserving the natural grassed environment. ‘We are very pleased with the solution GRASSPROTECTA has given us. The overflow carpark is regularly utilised at the peak times usually Monday to Thursday and caters for approximately 70 addit